|
|
Stage 2
2) Prepare the
ground. Try to locate the building in your garden on as flat a ground
area as you can possibly find. If it is already level this is then
great.
If the ground is not level do as much preparation to make it a level
as possible this will reduce the number of batons to be used or
the amount of concrete needed to be poured. Back
a stage - next stage
|